Dog in a doublet bridge reconstruction: a case study

Mann, P. (1995) Dog in a doublet bridge reconstruction: a case study. In: Interdisciplinary Design for the Built Environment seminars, University of Cambridge. (Unpublished)

Full text not archived in this repository.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Abstract/Summary

Dog-in-a-Doublet Bridge Reconstruction Scheme integrates the interdisciplinary design to provide solution for different needs: to provide a crossing to carry the new 40-tonne loading requirement, to improve the visibility of the substandard junction, and within the funding available. The management of the project involves the co-ordination of different authorities, statutory undertakers and other bodies. At certain stages, there were negotiations with RSPB on the restriction of construction period from July to November. After the re-assessment of the environmental impact of the construction on the breeding and wintering birds, the restrict was waived. As the bid for the assessment, strengthening and structural maintenance of bridges in the Cambridgeshire County Council Transport Policies and Programme No. 21 (1995/96) for Dog-in-a-Doublet Bridge Reconstruction Schemes was unsuccessful to attract the Transport Supplement Grant (TSG). A series of temporary measures had to be undertaken until funding is available for its replacement.

Item Type:Conference or Workshop Item (Paper)
Refereed:Yes
Divisions:No Reading authors. Back catalogue items
ID Code:6182

University Staff: Request a correction | Centaur Editors: Update this record

Page navigation