Number of items: 5.
2022
Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061, Chong, H.-Y., Tanko, B. L. and Klufallah, M.
(2022)
Effect between trust in communication technology and
interorganizational trust in BIM-enabled projects.
Journal of Construction Management and Engineering, 148 (8).
04022059.
ISSN 1943-7862
doi: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002299
2020
Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061, Chong, H.-Y., Li, Q. and Wang, X.
(2020)
Joint-contract function effects on BIM-enabled EPC project performance.
Journal of Construction Engineering and Management, 146 (3).
ISSN 0733-9364
Liao, X., Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061 and Chong, H.-Y.
(2020)
Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects.
Engineering, Construction and Architectural Management, 27 (1).
pp. 227-244.
ISSN 0969-9988
doi: https://doi.org/10.1108/ECAM-02-2019-0110
2019
Fan, S.-L., Chong, H.-Y., Liao, P.-C. and Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061
(2019)
Latent provisions for building information modeling (BIM) contracts: a social network analysis approach.
KSCE Journal of Civil Engineering, 23 (4).
pp. 1427-1435.
ISSN 1976-3808
doi: https://doi.org/10.1007/s12205-019-0064-8
Tanko, B. L., Chai, C. S. and Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061
(2019)
Limitations of using the Revit-BIM software for quantification.
In: 23rd PAQS Congress 2019, 23-27 Aug 2019, Kuching, Malaysia.
This list was generated on Fri Nov 8 22:18:41 2024 UTC.