Number of items: 8.
Aouad, G., Hinks, J., Cooper, R., Sheath, D., Kagioglou, M. and Sexton, M. G.
(1998)
An IT map for the generic design and construction process protocol.
Journal of Construction Procurement, 4 (2).
pp. 22-44.
ISSN 1358-9180
Green, S. D. ORCID: https://orcid.org/0000-0003-1660-5592
(1998)
The technocratic totalitarianism of construction process improvement: a critical perspective.
Engineering, Construction and Architectural Management, 5 (4).
pp. 376-386.
ISSN 0969-9988
doi: https://doi.org/10.1108/eb021090
Green, S. D. ORCID: https://orcid.org/0000-0003-1660-5592 and Moss, G. W.
(1998)
Value management and post-occupancy evaluation: closing the loop.
Facilities, 16 (1-2).
pp. 34-39.
ISSN 0263-2772
doi: https://doi.org/10.1108/02632779810195839
Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136, ed.
(1998)
Proceedings of the 14th annual ARCOM conference.
Association of Researchers in Construction Management, Reading, pp687.
ISBN 0953416100
Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136, Hillebrandt, P. and Murdoch, J. R.
(1998)
Financial protection in the UK building industry: a guide for clients and the construction supply chain.
Thomas Telford Publications, London, pp24.
ISBN 0727727176
Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136, Hillebrandt, P.M. and Murdoch, J.
(1998)
Financial protection in the UK building industry: bonds, retentions and guarantees.
Taylor & Francis, London, pp208.
ISBN 9780419242901
Lingard, H., Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136 and Chinyio, E.
(1998)
The impact of contractor selection method on transaction costs: a review.
Journal of Construction Procurement, 4 (2).
pp. 89-102.
ISSN 1358-9180
Loosemore, M. and Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136
(1998)
Reactive crisis management in construction projects.
Journal of Contingencies and Crisis Management, 6 (1).
pp. 23-34.
ISSN 1468-5973
doi: https://doi.org/10.1111/1468-5973.00065
This list was generated on Wed Dec 25 08:09:51 2024 UTC.