Akin, O. (1986) Psychology of architectural design. London: Pion.
Ananiadou, S. and McNaught, J. (1995) Terms are not alone: term choice and choice terms. ASLIB Proceedings, 47(2), 47-60.
Anstruther, R. (1997) The legal connection: the role of the "constructor" is vital for anyone involved in "construction". Canadian occupational safety, 35(3), 13.
Archer, L.B. (1970) The structure of design processes.Sch. of Industrial Design, Royal College of Art.
Asimow, M.W. (1962) Introduction to design. Prentice Hall.
Barrows, R.C., Cimino, J J. and Clayton, P.D. (1994) Mapping clinically useful terminology to a controlled medical vocabulary. J. of Amer. Medical Informatics Association, (SS), 211-215.
Bartlett et al. (1998) Emden's construction law. London: Butterworths.
Beer, S. (1972) The brain of the firm. New York: Herder and Herder.
Bengtsson, S. (1984) Conformity between project objectives and company goals. In: Procs CIB W-65 4th Int Symp on Organization and Management of Construction. Waterloo, Canada July 1984. CIB.
Blake, S. (1993) A practical approach to legal advice and drafting. 4ed. London: Blackston.
Bowden, M.F. (1997) Terminology of learning disability. Brit. Journal of Psychiatry, 170, 579-579.
Bresnen, M.J. and Haslam, C.O. (1991) Construction industry clients: a survey of their attributes and project management practices. Construction Management and Economics, 9(4), 327-342.
British Property Federation (1983) Manual of the BPF System. London: British Property Federation.
British Standards Institution (1979) BS 3138: Glossary of terms used in management services. London: British Standards Institution.
British Standards Institution (1985) BS 6100: Glossary of building and civil engineering terms. London: British Standards Institution.
British Standards Institution (1997) BS 7000: Design management systems - Part 4, guide to managing design in construction. London: British Standards Institution.
Bröchner, J. (1994a) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(1), 91-101.
Bröchner, J. (1994b) Risk, inspection and responsibility for data: contract design for maintenance and construction. In: CIB W70: Strategies & Technologies for Maintenance & Modernization of Building. Tokyo 26-28 October 1994. CIB 1013-1020.
Burns, T. and Stalker, G.M. (1966) The management of innovation. London: Tavistock.
Butler, J.T. (1970) Elements of administration for building students London: Hutchinson Educational.
Carpenter, J. (1981) The UK system of construction procurement and what is wrong: how to improve. In: RICS Quantity Surveyors' 12th Triennial Conference. London 7-9 April 1981. Royal Institution of Chartered Surveyors
Chartered Institute of Building (1982) Project Management in Building. Ascot: Chartered Institute of Building.
Checkland, P. (1981) Systems thinking, systems practice. Chichester: Wiley.
Cherns, A.B. and Bryant, D.T. (1984) Studying the client's role in construction management. Construction Management and Economics, 2(2), 177-184.
Cleland, D.I. and King, W.R. (1975) Systems Analysis and Project Management. New York: McGraw-Hill.
Construction Industry Board (1997a) Constructing success: code of practice for clients of the construction industry. London: Thomas Telford.
Construction Industry Board (1997b) Selecting consultants for the team. London: Thomas Telford.
Construction Industry Council (1998) The management of building design information. Unpublished London: Construction Industry Council.
Cox, S. and Hamilton, A. (Eds.) (1995) Architect's Job Book, 6ed. London: RIBA Publications.
Dawson, S. (1996) Analysing organizations. 3ed. Basingstoke: Macmillan.
Draper, K. (1984) Systematic quality appraisal In: Brandon, P. and Powell, J. (Eds) Quality and profit in building design London: Spon.
Egan, J. (1998) Rethinking construction : the report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the scope for improving the quality and efficiency of UK construction. London: Department of the Environment, Transport and the Regions Construction Task Force.
Finn, M.D. (1984) Project management in development: a checklist. London.: Henry Stewart Publications.
Gordon, A. (Ed.) (1987) Co-ordinated project information: guide, London: Co-ordinating Committee for Project Information.
Gray, C., Hughes, W. and Bennett, J. (1994) The successful management of design. Reading: Centre for Strategic Studies in Construction.
Gray, C. and Hughes, W. (2001) Building design management. London: Butterworth-Heineman.
Guest, A. G. (Ed.) (1994) Chitty on contracts, 27ed. London: Sweet & Maxwell.
Hartmann, R.R.K. (Ed.) (1983) Lexicography: principles and practice, London: Academic Press.
Hays, S.M. (1988) A role in the building industry for chemical engineers. Chemical Engineering, 95(1), 121-124.
Hodgson, G. and Jeffry, J.A. (1999) A critical examination of the designer's role under the ICE design and construct conditions of contract and the Highway Agency's design and build conditions of contract. RICS Research Papers, 3(2), 1-24.
Hughes, W.P. (1989) Organizational analysis of building projects. Unpublished PhD Thesis, Department of Surveying, Liverpool Polytechnic.
Jaynes, G.L. (1994) Avoiding legal pitfalls of construction clients in Malaysia and abroad. The International Construction Law Review, 11(3), 353.
Joint Contracts Tribunal (1998) Consultants' agreement: schedule of services for use with JCT 80 and IFC 84. London: Joint Contracts Tribunal.
Jones, J.C. (1963) A method of systematic design In: Jones, J.C. and Thornley, D.G. (Eds) Conference on Design Methods London: Pergamon. pp. 53-73.
Jones, J.C. and Thornley, D.G. (Eds.) (1963) Conference on Design Methods, London: Pergamon.
Kagioglou, M., Cooper, R., Aouad, G., Hinks, J., Sexton, M. and Sheath, D. (1998) Generic guide to the design and construction process protocol. Salford: University of Salford.
Kagioglou, M., Cooper, R., Aouad, G. and Sexton, M. (2000) Rethinking construction: the generic design and construction process protocol. Engineering, Construction and Architectural Management, 7(2), 141-153.
Kast, F.E. and Rosenweig, J.F. (1985) Organization and management: a systems and contingency approach. Maidenhead: McGraw-Hill.
Khosrowshahi, F. (1988) Construction project budgeting and forecasting. Transactions of the American Association of Cost Engineers, C.3.1-C.3.6.
Klinger, P. (1994) Drafting and negotiating computer contracts. London: Butterworths.
Krueger, C.A. and Townsend, R.L. (1988) The controller's role in controlling construction costs. Management accounting, 70(6), 38-43.
Latham, M. (1994) Constructing the team: final report of the government/industry review of procurement and contractual arrangements in the UK construction industry. London: HMSO.
Lawson, B. (1990) How designers think: the design process demystified. 2nd ed. London: Butterworth Architecture.
Levin, P.H. (1966) The design process in planning. Town Planning Review, 37(1), 5-20.
Lewison, K. (1989) The interpretation of contracts. 2ed. London: Sweet & Maxwell.
Litterer, J.A. (1973) The analysis of organizations. 2ed. New York: Wiley.
Markus, T.A. (1969) The role of building performance measurement and appraisal in design method In: Broadbent, G. and Ward, A. (Eds) Design Methods in Architecture London: Lund Humphries. pp. 109-117.
Maver, T.W. (1970) Appraisal in the building design process In: Moore, G. T. (Ed) Emerging methods in environmental design and planning Cambridge, MA: MIT Press. pp. 195-202.
May, A. (1995) Keating on Building Contracts. London: Sweet & Maxwell.
Minogue, A. (1997) The case for the defence. Building, CCLXII(49), 12 Dec 1997, 28-29.
Murdoch, J. and Hughes, W. (2000) Construction contract: law and management. 3ed. London: Spon.
Ndekugri, I.E. and Rycroft, M.E. (2000) JCT 98 building contract: law and administration. London: Arnold.
Newton, A.J. (1995) The planning and management of detailed building design. Unpublished PhD Thesis, Document Supply Centre British Library.
Phillips, R. and Lupton, S. (2000) Architect's plan of work. London: RIBA Publications.
Pike, A. (1993) Practical building forms and agreements. London: Spon.
Price, J. (1994) Sub-contracting. Basingstoke: Macmillan.
Property Advisors to the Civil Estate (1998) GC/Works/5 General conditions for the appointment of consultants. London: The Stationery Office.
Raats, M.M. and Shepherd, R. (1996) Developing a subject-derived terminology to describe perceptions of chemicals in foods. Risk Analysis, 16(2), 133-146.
Reich, Y., Konda, S.L., Monarch, I.A., Levy, S. N. and Subrahmaniam, E. (1996) Varieties and issues of participation and design. Design Studies, 17(2), 165-180.
Riggs, F.W. (1996a) Onomantics and terminology, 1: Their contributions to knowledge organization. Knowledge Organization, 23(1), 25-33.
Riggs, F.W. (1996b) Onomantics and terminology, 2: Core concepts. Knowledge Organization, 23(3), 157-168.
Riggs, F.W. (1996c) Onomantics and terminology, 3: Formats, borrowed terms and omissions. Knowledge Organization, 23(4), 216-224.
Ross, M.J. (1994) Drafting and negotiating commercial leases. London: Butterworths.
Royal Institution of British Architects (1992) Standard form of agreement for the appointment of an architect: SFA/92. London: RIBA Publications Ltd.
Royal Institution of British Architects (1995) Conditions of engagement for the appointment of an architect: CE/95. London: RIBA Publications Ltd.
Royal Institution of British Architects (1997) Plan of work for design team operation. London: RIBA Publications Ltd.
Rylance, P. (1994) Legal writing and drafting. London: Blackstone.
Samad, S.A. (1994) The role and operations of multinational organizations. Transactions of the American Association of Cost Engineers, INT5.1-INT5.6.
Scott, S. and Assadi, S. (1999) A survey of the site records kept by construction supervisors. Construction Management and Economics, 17(3), 375-382.
Scott, W.R. (1981) Organizations: rational, natural and open systems. Englewood Cliffs, NJ: Prentice-Hall.
Shoesmith, D.R. (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(2), 93-101.
Sidwell, A. (1990) Project management: dynamics and performance. Construction Management and Economics, 8(2), 159-179.
Sonnenwald, D.H. (1996) Communication roles that support collaboration during the design process. Design Studies, 17(3), 277-301.
Sonneveld, H.B., Helmi, B. and Loening, K.L. (Eds.) (1993) Terminology: applications in interdisciplinary communication, Amsterdam: John Benjamins.
Thompson, J.D. (1967) Organizations in action. New York: McGraw-Hill.
Walker, A. (1980) A model for the design of project management structures for building clients. Unpublished PhD Thesis, Department of Surveying, Liverpool Polytechnic.
Wallace, I.N.D. (1995) Hudson's building and engineering contracts. 11ed. London: Sweet & Maxwell.