Anumba, C J and Evbuomwam, N F O (1997) Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), 271-81.
Bajaj, D, Oluwoye, J O and Lenard, D (1997) An analysis of contractors' approaches to risk identification in New South Wales, Australia. Construction Management and Economics, 15(4), 363-9.
Becker, D F (1993) The cost of general conditions. AACE transactions.
Betts, M (1990) Methods and data used by large building contractors in preparing tenders. Construction Management and Economics, 8(4), 399-414.
Chang, C-Y and Ive, G (2001) A comparison of two ways of applying a transaction cost approach: The case of construction procurement routes. In: Bartlett Research papers, No. 13, 41pp.
Connaughton, J N (1994) Value by competition: A guide to the competitive procurement of consultancy services for construction, London: Construction Industry Research and Information Association.
Grimsey, D and Graham, R (1997) PFI in the NHS (private finance initiative in the UK national health service). Engineering, Construction and Architectural Management, 4(3), 215-31.
Latham, M (1994) Constructing the team: Final report of the government/industry review of procurement and contractual arrangements in the UK construction industry, London: HMSO.
Levene, P, Jackson, N, Gray, R, Jensen, J, Massey, G, Moschini, S, West, R and Woodman, R (1995) Construction procurement by government: An efficiency unit scrutiny (the Levene report), London: Efficiency Unit Cabinet Office.
Lingard, H, Hughes, W P and Chinyio, E (1998) The impact of contractor selection method on transaction costs: A review. Journal of Construction Procurement, 4(2), 89-102.
Loosemore, M (1996) Crisis management in building projects: A longitudinal investigation of communication and behaviour patterns within a grounded theory framework, Unpublished PhD Thesis, Department of Construction Management & Engineering, University of Reading.
Masden, S E, Meehan, J, W. and Snyder, E, A. (1991) The costs of organization. Journal of Law, Economics and Organization, 7(1), 1-25.
Matthews, J, Tyler, A and Thorpe, A (1996) Pre-construction project partnering: Developing the process. Engineering, Construction and Architectural Management, 3(1/2), 117-31.
Nettleton, B (2000) Best value and direct services. ICE Proceedings: Municipal Engineer, 139(2), 83-90.
Ng, S T, Kumaraswamy, M and Chow, L K (2001) Selecting consultants through combined technical and fee assessment: A Hong Kong study. In: Akintoye, A (Ed.), 17th Annual ARCOM Conference, 5-7 September 2001, University of Salford. Association of Researchers in Construction Management, Vol. 1, 639-48.
Pasquire, C and Collins, S (1996) The effect of competitive tendering on value in construction. RICS Research Papers, 2(5), 1-32.
Simister, S J (1994) An investigation into the influences on construction professionals' working practices, Unpublished PhD Thesis, Department of Construction Management & Engineering, University of Reading.
Svensson, R (2001) Success determinants when tendering for international consulting projects. International Journal of the Economics of Business, 8(1), 101-22.
Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(1/2), 83-95.
Wang, S Q, Tiong, R L K, Ting, S K, Chew, D and Ashley, D (1998) Evaluation and competitive tendering of BOT power plant project in china. ASCE Journal of Construction Engineering and Management, 124(4), 333-41.
Wong, C H, Holt, G D and Cooper, P A (2000) Lowest price or value? Investigation of UK construction clients' tender selection process. Construction Management and Economics, 18(7), 767-74.
Zarkada-Fraser, A (2000) A classification of factors influencing participating in collusive tendering agreements. Journal of Business Ethics, 23(3), 269-82.