Construction contracts: law and management. 5th editionHughes, W. ORCID: https://orcid.org/0000-0002-0304-8136, Champion, R. and Murdoch, J. (2015) Construction contracts: law and management. 5th edition. Routledge, London, pp435. ISBN 9780415657051 Full text not archived in this repository. It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing. Abstract/SummaryThe fifth edition of this best-selling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparison of working with JCT, NEC3 and FIDIC contracts, throughout. In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and is an extremely useful source of reference for practitioners.
Abrahamson, M. (1984) Risk management. International Construction Law Review. 1(3), 241–64.
Allott, T. (Ed.) (1998) Common Arrangement of Work Sections for Building Works. Construction Project Information Committee, London.
Andrews, J. (1983) The age of the client. Architect’s Journal. 13 July, 32–3.
Assocation for Consultancy and Engineering and Civil Engineering Contractors Association (2011) Infrastructure Conditions of Contract. ACE and CECA, London.
Arden, M. (1996) Privity of Contract: Contracts for the Benefit of Third Parties: Item 1 of the Sixth Programme of Law Reform: The Law Of Contract. Law Com; no. 242. HMSO, London.
Banwell, G.H. (1964) The Placing and Management of Contracts for Building and Civil Engineering Works. HMSO, London.
Bartlett, A., Lloyd, H. and Palmer, N.E. (2002) Emden’s Construction Law. Lexis Nexis Butterworths, London.
Bennett, J. and Jayes, S. (1998) The Seven Pillars of Partnering. Thomas Telford, London.
Bennett, J. and Peace, S. (2006) Partnering in the Construction Industry. A Code of Practice for Strategic Collaborative Working. Butterworth-Heinemann, Oxford.
Boukendour, S. and Hughes, W.P. (2014) Collaborative incentive contracts: stimulating competitive behaviour without competition. Construction Management and Economics, 32, 279–89. DOI: 10.1080/01446193.2013. 875215.
Bowley, M. (1966) The British Construction Industry. Cambridge University Press, Cambridge.
Bresnen, M. (1990) Organizing Construction: Project Organization and Matrix Management. Routledge, London.
Bresnen, M. and Marshall, N. (2000) Building partnerships: case studies of client-contractor collaboration in the UK construction industry. Construction Management and Economics, 18, 819–32 DOI: 10.1080/014461900433104.
Bridgewater, M. and Hemsley, A. (2006) NEC 3: a change for the better or a missed opportunity? International Construction Law Review, 23(1), 39–58.
British Standards Institution (2010) BS ISO 10845-1:2010, Construction Procurement, Part 1: Processes, Methods and Procedures. British Standards Institution, London.
British Standards Institution (2011) BS 8543:2011 Construction Procurement Policies, Strategies and Procedures: Code of Practice, British Standards Institution, London.
Brookes, I, (Ed.) (2003) Chambers Dictionary. 9th ed. Chambers Harrap, London.
Brown, H.J. and Marriott, A.L. (1999) ADR Principles and Practice. 2nd ed. Sweet and Maxwell, London.
Bunni, N.G. (1985) The Spectrum of Risks in Construction. Report of the Standing Committee on Professional Liability. Fédération Internationale des Ingénieurs-Conseils, Lausanne.
Brown, A.D. and Phua, F.T.T. (2011) Subjectively construed identities and discourse: towards a research agenda for construction management, Construction Management and Economics, 29, 83–95. DOI: 10.1080/ 01446193.2010.531028.
Cabinet Office (2011) Government Construction Strategy. Cabinet Office, London.
Cartlidge, D. (2011) New Aspects of Quantity Surveying Practice. 3rd ed. Spon Press, London.
Cecil, R. (1988) RIBA Indemnity Research: Risk Avoidance. RIBA Publications, London.
Chappell, D. (2006) MW05 Contract Administration Guide. RIBA Publishing, London.
Chapman, R.J. (1998) An Investigation of the Risk of Changes to Key Project Personnel During the Design Stage. Unpublished PhD Thesis, School of Construction Management and Engineering, University of Reading.
Cherns, A.B. and Bryant, D.T. (1984) Studying the client’s role in construction management. Construction Management and Economics. 2, 177–84. DOI: 10.1080/01446198400000016.
Construction Industry Board (1997) Code of Practice for the Selection of Main Contractors. Thomas Telford, London.
Davison, J. (2006) JCT 2005 What’s New? RICS Business Services Ltd., Coventry.
Draper, M. (2007) Dispute adjudication boards. Construction Law, 18(3), 32.
Dubois, A. and Gadde, L.E. (2002) The construction industry as a loosely coupled system: implications for productivity and innovation. Construction Management and Economics, 20, 621–31. DOI: 10.1080/01446190210163543.
Drummond, H. (2011) MIS and illusions of control: an analysis of the risks of risk management. Journal of Information Technology, 26, 250–267. DOI: 10.1057/jit.2011.9.
Egan, J. (1998) Rethinking Construction: The Report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the Scope for Improving the Quality and Efficiency of UK Construction. Department of the Environment, Transport and the Regions Construction Task Force, London.
Eggleston, B. (2006) The NEC 3 Engineering and Construction Contract. A Commentary. 2nd ed. Blackwell Science, Oxford.
Elliott, P. (1972) The Sociology of the Professions. Macmillan, London.
FIDIC (2001) FIDIC Contracts Guide (Construction, Plant and Design-Build and EPC/Turnkey Contract). Fédération Internationale des Ingénieurs-Conseils, Geneva.
Furst, S. and Ramsey, V. (2012) Keating on Contracts. 9th ed. Sweet & Maxwell, London.
Gaitskell, R. (2005) Trends in dispute resolution. Arbitration. 71(4) 288–99.
Gray, C. and Hughes, W.P. (2000) Building Design Management. Butterworth-Heinemann, London.
Greenwood, D.J. (1993) Contractual Arrangements and Conditions of Contract for the Engagement of Specialist Engineering Contractors for Construction Projects. CASEC, London.
Gruneberg, S.L. and Hughes, W.P. (2006) Understanding construction consortia: theory, practice and opinions. RICS Research Papers. 6(1), 1–55. http:// centaur.reading.ac.uk/12075/ (Accessed 4 August 2014).
Gruneberg, S. and Hughes, W.P. (2011) A Review of Performance-Based Contracting. RICS Research. Report. Royal Institution of Chartered Suveyors, London. http://centaur.reading.ac.uk/21392/ (Accessed 4 August 2014).
Gutman, R. (1988) Architectural Practice: A Critical View. Princeton Architectural Press, New York.
Hackett, M., Robinson, I. and Statham, G. (2007) The Aqua Group Guide to Procurement, Tendering and Contract Administration. Blackwells, London.
Harris, F. and McCaffer, R. (2013) Modern Construction Management. 7th ed. Wiley-Blackwell, Oxford.
Haswell, C.K. and de Silva, D.S. (1989) Civil Engineering Contracts: Practice & Procedure. 2nd ed. Butterworth, London.
Hawk, D. (1996) Relations between architecture and management. Journal of Architectural and Planning Research. 13(1), 10–33.
HM Treasury (2003) The Green Book: Appraisal and Evaluation in Central Government. The Stationery Office, London.
Honeyman, S. (Chairman) (1991) Construction Management Forum: Report and Guidance. Centre for Strategic Studies in Construction, University of Reading.
Hughes, W.P. (1989) Organizational Analysis of Building Projects. Unpublished PhD Thesis, Department of Surveying, Liverpool Polytechnic.
Hughes, W.P. (1997) Construction management contracts: law and practice. Engineering, Construction and Architectural Management. 4(1), 59–79. DOI: 10.1108/eb021040.
Hughes, W.P., Gray, C. and Murdoch, J.R. (1997) Specialist Trade Contracting: Report. CIRIA Publications, London.
Hughes, W.P. and Greenwood, D.G. (1996) The standardization of contracts for construction. International Construction Law Review. 13(2), 196–206.
Hughes, W.P. and Hillebrandt, P.M. (2003) Construction industry: historical overview and technological change. In: Mokyr, J. (Ed), The Oxford Encyclopedia of Economic History, Oxford University Press, Oxford, Vol 1, 504–12.
Hughes, W.P., Hillebrandt, P., Greenwood, D.G. and Kwawu, W.E.K. (2006) Procurement in the Construction Industry: the Impact and Cost of Alternative Market and Supply Processes. Taylor and Francis, London.
Hughes, W.P., Hillebrandt, P. and Murdoch, J.R. (1998) Financial Protection in the UK Building Industry: Bonds, Retentions and Guarantees.Spon, London.
Hughes, W.P. and Hughes, C. (2013) Professionalism and professional institutions in times of change. Building Research & Information, 41(1), 28–38. DOI: 10.1080/09613218.2013.737096.
Hughes, W.P. and Murdoch, J.R. (2001) Roles in Construction Projects: Analysis and Terminology. Construction Industry Publications, Birmingham. http://centaur.reading.ac.uk/4307/ (Accessed 1 Dec 2014).
Huxtable, P.J.C. (1988) Remedying Contractual Abuse in the Building Industry. Technical Information Service No. 99, Chartered Institute of Building, London.
Institution of Civil Engineers (1991) CESMM4: Civil Engineering Standard Method of Measurement. 4th ed. ICE Publishing, London.
Institution of Civil Engineers (1993) New Engineering Contract. Thomas Telford, London.
Institution of Civil Engineers (1995) Engineering and Construction Contract. 2nd ed. Thomas Telford, London.
Institution of Civil Engineers (2005a) ICE Dispute Resolution Board Procedure. Thomas Telford, London.
Institution of Civil Engineers (2005b) NEC 3 Engineering and Construction Contract. 3rd ed. Thomas Telford, London.
Institution of Civil Engineers (2005c) NEC 3 Engineering and Construction Contract Guidance Notes. 3rd ed. Thomas Telford, London.
Institution of Civil Engineers (2005d) NEC 3 Professional Services Contract. 3rd ed. Thomas Telford, London.
Institution of Civil Engineers (2005e) NEC 3 Professional Services Contract: Guidance Notes and Flow Charts. 3rd ed. Thomas Telford, London.
Joint Contracts Tribunal (1995) Practice Note 28: Mediation on a Building Contract or Sub-Contract Dispute. RIBA Publications, London.
Joint Contracts Tribunal (2002) Practice Note 6: Main Contract Tendering. RIBA Enterprises Ltd, London.
Joint Contracts Tribunal (2011a) Practice Note: Deciding on the Appropriate JCT Contract. Sweet & Maxwell, London.
Joint Contracts Tribunal (2011b) DB/G 2011: Design and Build Contract Guide. Sweet and Maxwell, London.
Joint Contracts Tribunal (2011c) Standard Building Contract Guide (SBC/G). Sweet and Maxwell, London.
Joint Contracts Tribunal (2011d) SCWa/E: Sub-Contractor Collateral Warranty for the Employer. Sweet and Maxwell, London.
Joint Contracts Tribunal (2012) Practice Note Tendering. Sweet & Maxwell, London.
Kabiri S., Hughes W.P. and Schweber L. (2012) Role conflict and role ambiguity in construction projects. In: Smith, S.D (Ed) Procs 28th Annual ARCOM Conference, 3–5 September 2012, Edinburgh, UK, Association of Researchers in Construction Management, 727–36.
Latham, M. (1994) Constructing the Team: Final Report of the Government/Industry Review of Procurement and Contractual Arrangements in the UK Construction Industry. HMSO, London.
Laryea, S.A. and Hughes, W.P. (2011) Risk and price in the bidding process of contractors. Journal of Construction Engineering and Management, 137(4), 248–58. DOI: 10.1061/(ASCE)CO.1943-7862.0000293.
Lawrence, P.C. and Lorsch, J.W. (1967) Organization and Environment: Managing Differentiation and Integration. Harvard University Press, Massachusetts.
Loosemore, M. (2011) Community-based protest against construction projects: a case study of movement continuity. Construction Management and Economics. 29, 131-44. DOI: 10.1080/01446193.2010.535545.
Loosemore, M., Raftery, J., Reilly, C. and Higgon, D. (2006) Risk Management in Projects. 2nd ed. Taylor & Francis, London.
Luck, R.A.C. (2007) Learning to talk to users in participatory design situations. Design Studies, 28(3), 217–42. DOI: 10.1016/j.destud.2007.02.002.
Luck, R.A.C. (2009) ‘Does this compromise your design?’ Interactionally producing a design concept in talk. Co-Design: International Journal of Co-creation in Design and the Arts, 5(1), 21–34. DOI: 10.1080/1571088 0802492896.
Lupton, S. (2006) Guide to SBC 05. RIBA Publishing, London.
Miller, E.J. and Rice, A.K. (1967) Systems of Organizations: The Control of Task and Sentient Boundaries. Tavistock Publications, London.
Mosey, D. (2013) ACA Standard Form of Contract for Project Partnering. PPC2000 amended 2013. Association of Consultant Architects, Bromley.
Murray, M. and Langford, D. (Eds.) (2003) Construction Reports 1944–98. Wiley-Blackwell, Oxford.
National Joint Consultative Committee for Building (1994a) Code of Procedure for Single-Stage Selective Tendering. NJCC, London.
National Joint Consultative Committee for Building (1994b) Code of Procedure for Two-Stage Selective Tendering. NJCC, London.
National Joint Consultative Committee for Building (1994c) Joint Venture Tendering for Contracts in the United Kingdom. NJCC, London.
National Joint Consultative Committee for Building (1995) Code of Procedure for Selective Tendering for Design & Build. NJCC, London.
Office of Government Commerce (2007) Achieving Excellence in Construction Procurement Guide. Office of Government Commerce, London.
Pain, J. and Bennett, J. (1988) JCT with contractor’s design form of contract: a study in use. Construction Management and Economics, 6, 307–37. DOI: 10.1080/01446198800000026.
Property Advisors to the Civil Estate (1998) GC/Works/1 Model Forms and Commentary. The Stationery Office, London.
Royal Institute of British Architects (2005) Code of Professional Conduct. RIBA Publications, London.
Royal Institute of British Architects (2012) RIBA Standard Agreement (2012 Revision): Architect. RIBA Enterprises, London.
Royal Institution of Chartered Surveyors (2012) NRM2: Detailed Measurement for Capital Building Works. RICS Books, London.
Scheer, D.R. (2014) The Death of Drawing: Architecture in the Age of Simulation. Routledge, London.
Scott, W.R. (1981) Organizations: Rational, Natural and Open Systems. Prentice-Hall, Englewood Cliffs, NJ.
Seppala, C.R. (1995) The new FIDIC international civil engineering sub-contract. International Construction Law Review. 12(1), 5–22.
Shash, A.A. (1993) Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11, 111–18. DOI: 10.1080/01446199300000004.
Skinner, D.W.H. (1981) The Contractor’s Use of Bills of Quantities. CIOB Occasional Paper No. 24. Chartered Institute of Building, Ascot.
Smith, N.J., Merna, T. and Jobling, P. (2006) Managing Risk in Construction Projects. 2nd ed. Blackwell, London.
Spiers, G.S. (1983) The Standard Form of Contract in Times of Change. Chartered Institute of Building, Ascot.
Thompson, A. (1999) Architectural Design Procedures, 2nd ed. Arnold, London.
Thompson, J.D. (1967) Organizations in Action. McGraw-Hill, New York.
Tjosvold, D. (1992) The Conflict-Positive Organization. Addison-Wesley, Massachusetts.
Tutt, D., Pink, S., Dainty, A.R.J. and Gibb, A. (2013) Building networks to work: an ethnographic study of informal routes into the UK construction industry and pathways for migrant up-skilling. Construction Management and Economics, 31, 1025–37. DOI: 10.1080/01446193.2013.834066.
Uff, J. (Ed.) (1997) Construction Contract Reform: A Plea for Sanity. Construction Law Press, London.
Uff, J. (2003) Duties at the Legal Fringe: Ethics in Construction Law. Society of Construction Law Paper 115. Society of Construction Law, London.
Uff, J. (2005) Construction Law: Law and Practice Relating to the Construction Industry. 9th ed. Sweet and Maxwell, London.
Wakita, O.A. and Linde, R.M. (2002) Professional Practice of Architectural Working Drawings. 3rd ed. Wiley, London.
Wallace, I.N.D. (1986) Construction Contracts: Principles and Policies in Tort and Contract. Sweet and Maxwell, London.
Wallace, I.N.D. (1995) Hudson’s Building and Engineering Contracts. 11th ed. Sweet and Maxwell, London.
Weddell, T.W. (2006) Choosing the Right NEC Contract. Thomas Telford Publishing, London.
Woodward, J. (1965) Industrial Organization: Theory and Practice. Oxford University Press, London. University Staff: Request a correction | Centaur Editors: Update this record |