Dealing with weather-related claims in construction contracts: a new approach

Ballesteros-Pérez, P., Kabiri, S. ORCID: https://orcid.org/0000-0002-5311-7304, Smith, S. T. ORCID: https://orcid.org/0000-0002-5053-4639 and Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136 (2017) Dealing with weather-related claims in construction contracts: a new approach. In: Pellicer, E., Adam, J. M., Yepes, V., Singh, A. and Yazdani, S. (eds.) Resilient Structures and Sustainable Construction. ISEC Press, pp. 1-6. ISBN 9780996043748

[img] Text - Published Version
· Restricted to Repository staff only
· The Copyright of this document has not been checked yet. This may affect its availability.

452kB

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

To link to this item DOI: 10.14455/ISEC.res.2017.221

Abstract/Summary

Project execution is often delayed by extreme and unforeseen weather conditions. This is because extreme weather usually causes work disruption, waste of resources, significant project delays and, eventually, financial losses for both the contractor and the project owner. Construction contracts generally include weather-related clauses addressing when, and to what extent, the responsibilities and consequences of adverse weather are to be shared or compensated. However, setting clear and objective limits for abnormal weather is problematic, starting with the lack of agreement about which weather conditions can be considered as "normal" or "average”. Research on the influence of weather on construction productivity is scarce and underdeveloped. Therefore, practitioners cannot count on sound methods to mediate in and evaluate weather-related contract disputes. In these situations, claims are likely to arise and escalate. A stochastic model for objectively evaluating the weather influence during the execution stage is proposed. This model allows actual weather to be compared to historical data in a way that provides an objective assessment of the extent to which the adverse weather was (or not) exceptional. A case study of a fictional project is used to show its implementation. This is the first tool of its kind to address this concern with a straightforward, holistic and quantitative approach.

Item Type:Book or Report Section
Refereed:Yes
Divisions:Science > School of the Built Environment > Organisation, People and Technology group
Science > School of the Built Environment > Energy and Environmental Engineering group
ID Code:72532
Uncontrolled Keywords:productivity, delay, stochastic, prolongation, disruption, compensation
Additional Information:Proceedings of the Ninth International Structural Engineering and Construction Conference Valencia, Spain, July 24-July 29, 2017.