Modelling the boundaries of project fast-tracking

Ballesteros-Pérez, P. (2017) Modelling the boundaries of project fast-tracking. Automation in Construction, 84. pp. 231-241. ISSN 0926-5805

[img]
Preview
Text - Accepted Version
· Available under License Creative Commons Attribution Non-commercial No Derivatives.
· Please see our End User Agreement before downloading.

436kB

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

To link to this item DOI: 10.1016/j.autcon.2017.09.006

Abstract/Summary

Fast-tracking a project involves carrying out sequential activities in parallel, partially overriding their original order of precedence, to reduce the overall project duration. The current predominant mathematical models of fast-tracking are based on the concepts of activity sensitivity, evolution, dependency and, sometimes, information exchange uncertainty, and aim to determine optimum activity overlaps. However, these models require some subjective inputs from the scheduler and most of them neglect the merge event bias. In this paper, a stochastic model for schedule fast-tracking is proposed. Relevant findings highlight the existence of a pseudo-physical barrier that suggests that the possibility of shortening a schedule by more than a quarter of its original duration is highly unlikely. The explicit non-linear relationship between cost and overlap has also been quantified for the first time. Finally, manual calculations using the new model are compared with results from a Genetic Algorithm through a case study.

Item Type:Article
Refereed:Yes
Divisions:Science > School of the Built Environment
ID Code:72593
Uncontrolled Keywords:Concurrent engineering; Scheduling; Fast-tracking; Activity crashing; Schedule compression; Activity overlap
Publisher:Elsevier

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Page navigation