Process planning methodology: dynamic short-term planning for off-site construction in Slovenia

Radosavljevic, M. and Horner, R. M. W. (2007) Process planning methodology: dynamic short-term planning for off-site construction in Slovenia. Construction Management and Economics, 25 (2). pp. 143-156. ISSN 0144-6193

Full text not archived in this repository.

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

To link to this item DOI: 10.1080/01446190601026494

Abstract/Summary

Planning is a vital element of project management but it is still not recognized as a process variable. Its objective should be to outperform the initially defined processes, and foresee and overcome possible undesirable events. Detailed task-level master planning is unrealistic since one cannot accurately predict all the requirements and obstacles before work has even started. The process planning methodology (PPM) has thus been developed in order to overcome common problems of the overwhelming project complexity. The essential elements of the PPM are the process planning group (PPG), including a control team that dynamically links the production/site and management, and the planning algorithm embodied within two continuous-improvement loops. The methodology was tested on a factory project in Slovenia and in four successive projects of a similar nature. In addition to a number of improvement ideas and enhanced communication, the applied PPM resulted in 32% higher total productivity, 6% total savings and created a synergistic project environment.

Item Type:Article
Refereed:Yes
Divisions:Science > School of the Built Environment
ID Code:8125
Publisher:Taylor & Francis

University Staff: Request a correction | Centaur Editors: Update this record

Page navigation