Accessibility navigation


Sustainable approach to the replacement of water mains: environmental, social and economic considerations

Young, B. E., Seidu, R. D., Kelani, A., Robinson, H., Ebohon, O. J. and Madanayake, U. ORCID: https://orcid.org/0000-0002-9122-1882 (2023) Sustainable approach to the replacement of water mains: environmental, social and economic considerations. In: Haupt, T. C., Akinlolu, M., Simpeh, F., Amoah, C. and Armoed, Z. (eds.) Construction in 5D: Deconstruction, Digitalization, Disruption, Disaster, Development. Lecture Notes in Civil Engineering, 245. Springer, Cham, pp. 153-66. ISBN 9783030977474

[thumbnail of Sustainable_Approach_for_the_Replacement_of_Water_Mains_35428_.pdf]
Preview
Text - Accepted Version
· Please see our End User Agreement before downloading.

547kB

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

To link to this item DOI: 10.1007/978-3-030-97748-1_13

Abstract/Summary

Water mains in many areas of London and some parts of the Thames Valley are still thus the oldest and in need of replacement. The mains have been susceptible to corrosion, leaks and subsequent breakage, causing water wastage, continuous maintenance cost, social and environmental impact because of disruptions to water supply to local communities, road congestion and damage to the road infrastructure. The aim of this study is to examine the factors, which determines the methods adopted for the replacement of water mains and the economic, environmental, and social considerations that underpins the decision-making process. The research method adopted is a mixture of quantitative and qualitative approaches using surveys and interviews. These trenchless techniques are preferred due to lower cost, speed and productivity. Directional drilling was selected due to its cost, speed and productivity but also because it is the most customer driven method to ensure a constant supply of water. There is a need for a sustainable procurement approach incorporating social and environmental factors which affects productivity such as ground conditions, unknown utilities, the impact of water disruption on residents/schools and delays due to obtaining road access permits. Involvement of Local authorities in the design and accessibility discussion can help speed up the process and increase productivity.

Item Type:Book or Report Section
Refereed:Yes
Divisions:No Reading authors. Back catalogue items
Science > School of the Built Environment > Construction Management and Engineering
ID Code:116301
Publisher:Springer

Downloads

Downloads per month over past year

University Staff: Request a correction | Centaur Editors: Update this record

Page navigation