Accessibility navigation


Critical factors influencing the abandonment of housing projects in Osogbo, Nigeria

Dabara, D. I. ORCID: https://orcid.org/0000-0003-0749-3111 and Adegoke, O. J. (2017) Critical factors influencing the abandonment of housing projects in Osogbo, Nigeria. In: Environmental Design and Management International Conference (EDMIC) 2017, 22-24 May 2017, Osun State, Nigeria, pp. 179-188. (ISBN: 9782051316)

[thumbnail of CRITICAL FACTORS INFLUENCING THE INFLUENCING THE ABANDONMENT OF HOUSING PROJECTS IN OSOGBO NIGERIA.pdf] Text - Published Version
· Restricted to Repository staff only
· The Copyright of this document has not been checked yet. This may affect its availability.

245kB

It is advisable to refer to the publisher's version if you intend to cite from this work. See Guidance on citing.

Abstract/Summary

The study aims at examining the critical factors influencing the abandonment of housing projects in Osogbo, Nigeria with a view to providing information that could guide real estate investors' decision making. Through preliminary investigation, 138 abandoned housing projects were sighted in the study area. The study purposively distributed questionnaire to 67 owners of abandoned housing projects that were available. However, only 30 questionnaires were properly filled and retrieved for collation and analysis. Relative Importance Index (RII) and Multiple Regression Models were used to determine the interrelationships between housing project abandonment and the factors influencing it. Findings from the study revealed that insufficient funds was the most critical factor influencing housing project abandonment in the study area (RII 0.892), while change of project scope ranked the least critical factor (RII 0.725). The regression analysis carried out indicated a high positive correlation of 0.995 between all the variables revealing that the overall model is statistically significant, [F (19, 10) = 53.956, P = 0.000]. It was recommended among others that before prospective real estate investors venture into the construction of desired housing projects, it is imperative that sufficient funds be generated to cater for the proposed project. Similarly, clients should avoid changing the scope of the project in the middle of the housing project work. This could go a long way in reducing housing project abandonment in the study area.

Item Type:Conference or Workshop Item (Paper)
Refereed:Yes
Divisions:Henley Business School > Real Estate and Planning
ID Code:124661

University Staff: Request a correction | Centaur Editors: Update this record

Page navigation