Accessibility navigation


Browse by Creator

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
[tool] Batch List
Group by: Date | No Grouping | Item Type
Number of items: 5.

Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061, Chong, H.-Y., Tanko, B. L. and Klufallah, M. (2022) Effect between trust in communication technology and interorganizational trust in BIM-enabled projects. Journal of Construction Management and Engineering, 148 (8). 04022059. ISSN 1943-7862 doi: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002299

Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061, Chong, H.-Y., Li, Q. and Wang, X. (2020) Joint-contract function effects on BIM-enabled EPC project performance. Journal of Construction Engineering and Management, 146 (3). ISSN 0733-9364

Liao, X., Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061 and Chong, H.-Y. (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27 (1). pp. 227-244. ISSN 0969-9988 doi: https://doi.org/10.1108/ECAM-02-2019-0110

Fan, S.-L., Chong, H.-Y., Liao, P.-C. and Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061 (2019) Latent provisions for building information modeling (BIM) contracts: a social network analysis approach. KSCE Journal of Civil Engineering, 23 (4). pp. 1427-1435. ISSN 1976-3808 doi: https://doi.org/10.1007/s12205-019-0064-8

Tanko, B. L., Chai, C. S. and Lee, C.-Y. ORCID: https://orcid.org/0000-0001-6222-2061 (2019) Limitations of using the Revit-BIM software for quantification. In: 23rd PAQS Congress 2019, 23-27 Aug 2019, Kuching, Malaysia.

This list was generated on Fri Dec 27 06:21:20 2024 UTC.

Page navigation