Number of items: 69.
Dowsett, R. M. ORCID: https://orcid.org/0000-0003-3858-9036, Green, M. S. and Harty, C. F.
(2022)
Speculation beyond technology: building scenarios through storytelling.
Buildings and Cities, 3 (1).
pp. 534-553.
ISSN 2632-6655
doi: https://doi.org/10.5334/bc.213
(Special collection: Modern methods of construction: beyond productivity improvement)
Maftei, L. and Harty, C.
(2021)
Surprise: challenging design perceptions in immersive virtual reality environments? The case of designing a hospital project using a CAVE (Cave Automatic Virtual Environment).
Archnet-IJAR: International Journal of Architectural Research, 15 (3).
pp. 887-904.
ISSN 2631-6862
doi: https://doi.org/10.1108/ARCH-03-2021-0067
Jacobsen, P. H., Tryggestad, K. and Harty, C.
(2021)
Design as redesign in the case of architectural competitions: the role of design visualisations and juries.
Culture and Organization, 27 (1).
pp. 51-70.
ISSN 1477-2760
doi: https://doi.org/10.1080/14759551.2020.1778697
Dowsett, R. M. ORCID: https://orcid.org/0000-0003-3858-9036 and Harty, C. F.
(2019)
Assessing the implementation of BIM – an information systems approach.
Construction Management and Economics, 37 (10).
pp. 551-566.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446193.2018.1476728
Dowsett, R. ORCID: https://orcid.org/0000-0003-3858-9036, Green, M., Sexton, M. and Harty, C.
(2019)
Projecting at the project-level: MMC supply chain integration roadmap for small housebuilders.
Construction Innovation: Information, Process, Management, 19 (2).
pp. 193-211.
ISSN 1471-4175
doi: https://doi.org/10.1108/CI-07-2017-0059
Dowsett, R. ORCID: https://orcid.org/0000-0003-3858-9036, Leicht, R. and Harty, C.
(2018)
Organisational implications of robotics in the management of engineering projects.
In: 16th Engineering Project Organization Conference, June 25-27, 2018, Brijuni, Croatia, pp. 897-910.
Maftei, L., Roupé, M., Johansson, M. and Harty, C.
(2018)
Power plays: designers, users and interactive digital technology.
In: 34th Annual ARCOM Conference, 3-5 September 2018, Belfast, UK.
Ofori-Darko, J., Nikolic, D. ORCID: https://orcid.org/0000-0002-4001-8104 and Harty, C.
(2018)
Team interactions in digitally-mediated design meetings.
In: 35th CIB W78 2018 Conference: IT in Design, Construction, and Management, October 1-3, 2018, Chicago, Illinois, United States, pp. 247-254.
Dowsett, R. ORCID: https://orcid.org/0000-0003-3858-9036, Harty, C. and Davies, R.
(2017)
Epistemological differences and new technology in construction.
In: 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK, pp. 714-723.
Leicht, R. and Harty, C.
(2017)
Influence of multiparty IPD contracts on construction innovation.
In: ARCOM 2017, 4-6 Sep 2017, Cambridge, pp. 164-173.
Orstavik, F. and Harty, C.
(2017)
The unexplored brutality of performance recipes.
In: ARCOM 2017, 4-6 Sep 2017, Cambridge, pp. 512-521.
Tryggestad, K., Harty, C. and Jacobsen, P. H.
(2017)
The building as context and object: or how to design a new hospital building and healthcare organization.
In: The 24th Nordic Academy of Management Conference, 23-25 August 2017, Bodø, Norway.
Harty, C. and Leiringer, R.
(2017)
The futures of construction management research.
Construction Management and Economics, 35 (7).
pp. 392-403.
ISSN 1466-433X
doi: https://doi.org/10.1080/01446193.2017.1306089
Green, M., Dowsett, R. ORCID: https://orcid.org/0000-0003-3858-9036, Sexton, M. and Harty, C.
(2017)
Liquid integration and modern methods of construction: eddies of house-building in the UK.
In: , 9th Nordic Conference on Construction Economics and Organization, 13-14 June, 2017, Chalmers University of Technology, Göteborg, SWEDEN, pp. 152-162.
Dowsett, R. ORCID: https://orcid.org/0000-0003-3858-9036, Harty, C. and Davies, R.
(2017)
The complete robot? The human-machine interface in temporary off-site construction work.
In: 9th Nordic Conference on Construction Economics and Organization, 13-14 June, 2017, Chalmers University of Technology, Göteborg, SWEDEN, pp. 93-103.
Dainty, A., Leiringer, R., Fernie, S. and Harty, C.
(2017)
BIM and the small construction firm: a critical perspective.
Building Research & Information, 45 (6).
pp. 696-709.
ISSN 0961-3218
doi: https://doi.org/10.1080/09613218.2017.1293940
Alnaser, A. and Harty, C.
(2016)
The implications of BIM execution on communication channels in the design process.
In: CIB World Building Congress, 30th May - 3rd June 2016, Tampere, Finalnd.
Maftei, L. and Harty, C.
(2016)
Challenging design perceptions in immersive virtual reality environments?
In: 32nd Annual ARCOM (Association of Researchers in Construction Management) Conference, 5-7 September 2016, Manchester.
Dowsett, R. ORCID: https://orcid.org/0000-0003-3858-9036 and Harty, C.
(2016)
Making the link between BIM's benefits and implementation.
In: ARCOM 32nd Annual Conference, 5th - 7th September 2016, Manchester.
(In: Chan, P W (Ed.) and Neilson, C J (Ed.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 35-44.)
Harty, C. and Dainty, A.
(2016)
Opening up the sociological imagination: construction management as the enabler of society.
In: Engineering Project Organization Conference 2016, June 28-30, 2016, Cle Elum, Washington, USA.
(Working Paper Series, Proceedings of the Engineering Project Organization Conference, Cle Elum, WA, June 28-30, 2016)
Jacobsen, P. H., Harty, C. and Tryggestad, K.
(2016)
(Re)constructing the wicked problem through the visual and the verbal: the case of a dialogue based architectural competition.
In: ARCOM 32nd Annual Conference.
(Chan, P W (Ed.) and Neilson, C J (Ed.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 761-770.)
Maftei, L. and Harty, C.
(2015)
Designing in caves: using immersive visualisations in design practice.
International Journal of Architectural Research: ArchNet-IJAR, 9 (3).
pp. 53-75.
ISSN 1938-7806
doi: https://doi.org/10.26687/archnet-ijar.v9i3.693
(special issue “Design Creativity: "Future Integrated Visualisation Directions”)
Heeramun, P., Nikolic, D. ORCID: https://orcid.org/0000-0002-4001-8104 and Harty, C.
(2015)
Technology-enabled collaborative spaces for design and
construction reviews.
In: CIB W78 Conference, 27-29 Sep 2015, Eindhoven, The Netherlands.
Shibeika, A. ORCID: https://orcid.org/0000-0003-0226-9241 and Harty, C.
(2015)
Diffusion of digital innovation in construction: a case study of a UK engineering firm.
Construction Management and Economics, 33 (5-6).
pp. 453-466.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446193.2015.1077982
Davies, R., Crespin-Mazet, F., Linne, A., Pardo, C., Havenvid, M. I., Harty, C., Ivory, C. and Salle, R.
(2015)
BIM in Europe: innovation networks in the construction sectors of Sweden, France and the UK.
In: 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK, pp. 1135-1144.
Young, B., Harty, C., Lu, S.-L. ORCID: https://orcid.org/0000-0001-6773-5907 and Davies, R.
(2015)
Developing temporary manufacturing facilities for residential building: a case of the modern flying factory.
In: the 31st ARCOM Conference, 7th – 9th September, Lincoln, England, UK, pp. 1033-1042.
Ewart, I. J. ORCID: https://orcid.org/0000-0002-9502-2338 and Harty, C.
(2015)
Provision of disability adaptations to the home: analysis of household survey data.
Housing Studies, 30 (6).
pp. 901-924.
ISSN 0267-3037
doi: https://doi.org/10.1080/02673037.2014.991379
Harty, C. and Tryggestad, K.
(2015)
The hospital building as project and matter of concern: the role of representations in negotiating patient room designs and bodies.
Engineering Project Organization Journal, 5 (2-3).
pp. 95-105.
ISSN 2157-3735
doi: https://doi.org/10.1080/21573727.2015.1046047
Dowsett, R. ORCID: https://orcid.org/0000-0003-3858-9036 and Harty, C.
(2015)
Moving from static to dynamic measures of BIM success.
In: Association of Researchers in Construction Management 31st Annual Conference, 7-9 Sep 2015, Lincoln, UK, pp. 601-610.
Maftei, L. and Harty, C.
(2014)
Designers' perspectives on the use of immersive virtual reality technology in practice.
In: 30th Annual ARCOM Conference, 1-3 Sept 2014, Portsmouth, U.K., pp. 175-184.
Davies, R. and Harty, C.
(2014)
Initial use of an idea capture app in a UK construction organisation.
In: 30th Annual ARCOM Conference, 1-3 Sept 2014, Portsmouth, U.K., pp. 987-996.
Collinge, W. H. and Harty, C. F.
(2014)
Stakeholder interpretations of design: Semiotic insights into the briefing process.
Construction Management and Economics, 32 (7-8).
pp. 760-772.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446193.2014.894247
Dowsett, R. M. ORCID: https://orcid.org/0000-0003-3858-9036 and Harty, C. F.
(2014)
The wider implementation issues of BIM within a multifaceted property and real estate consultancy.
In: Association of Researchers in Construction 30th Annual Conference, 1-3 Sep 2014, Portsmouth, UK, pp. 653-662.
Dowsett, R. M. ORCID: https://orcid.org/0000-0003-3858-9036 and Harty, C. F.
(2013)
Evaluating the benefits of BIM for sustainable design – a review.
In: Association of Researchers in Construction Management 29th Annual Conference, 2-4 September 2013, Reading, UK.
Maftei, L. and Harty, C.
(2013)
Accounting for users: design team work in immersive virtual reality environments.
In: Proceedings 29th Annual ARCOM Conference, Association of Researchers in Construction Management, 2-4 September 2013, Reading, UK, pp. 157-166.
Davies, R. and Harty, C.
(2013)
Implementing ‘Site BIM’: a case study of ICT innovation on a large hospital project.
Automation in Construction, 30.
pp. 15-24.
ISSN 0926-5805
doi: https://doi.org/10.1016/j.autcon.2012.11.024
Davies, R. and Harty, C.
(2013)
Measurement and exploration of individual beliefs about the consequences of building information modelling use.
Construction Management and Economics, 31 (11).
pp. 1110-1127.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446193.2013.848994
Collinge, B. and Harty, C.
(2012)
Exploring the semiotic properties of design artefacts.
In: 28th EGOS Colloquium, July 5 – 7, 2012, Helsinki, Finland.
Whyte, J. and Harty, C.
(2012)
Socio-material practices of design coordination: objects as plastic and partisan.
In: Leonardi, P., Nardi, B. and Kallinikos, Y. (eds.)
Materiality and Organizing : Social Interaction in a Technological World.
Oxford University Press, Oxford, pp. 196-216.
ISBN 9780199664054
doi: https://doi.org/10.1093/acprof:oso/9780199664054.003.0010
Davies, R. and Harty, C.
(2011)
Building Information Modelling as innovation journey: BIM experiences on a major UK healthcare infrastructure project.
In: 6th Nordic Conference on Construction Economics and Organisation – Shaping the Construction / Society Nexus, 13th - 15th April 2011, Copenhagen, pp. 233-245.
(Proceedings volume 2)
Harty, C. and Koch, C.
(2011)
Revisiting boundary objects: Enterprise Resource Planning and Building Information Modelling systems as multi-community artefacts.
In: 6th Nordic Conference on Construction Economics and Organisation - Shaping the Construction / Society Nexus, 13th - 15th April 2011, Copenhagen, pp. 283-294.
(Proceedings volume 2)
Harty, C. and Whyte, J.
(2010)
Emerging hybrid practices in construction design work:
role of mixed media.
Journal of Construction Management and Engineering, 136 (4).
pp. 468-476.
ISSN 1943-7862
doi: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000146
Schweber, L. ORCID: https://orcid.org/0000-0002-6069-0002 and Harty, C.
(2010)
Actors and objects: A socio-technical networks approach for construction management research.
Construction Management and Economics, 28 (6).
pp. 657-674.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446191003702468
Collinge, W. H., Harty, C. F., Liu, K. and Tang, Y.
(2010)
Assessing organizational semiotics for IT systems design: improving information exchange processes across construction project stakeholders.
In: 26th International Conference on IT in Construction & 1st International Conference on Managing Construction for Tomorrow, 1-3 Oct 2009, Istanbul, Turkey, pp. 239-247.
Bresnen, M. and Harty, C.
(2010)
Editorial: Objects, knowledge sharing and knowledge transformation in projects.
Construction Management and Economics, 28 (6).
pp. 549-555.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446193.2010.495850
Harty, C., Throssell, D., Jeffrey, H. and Stagg, M.
(2010)
Implementing Building Information Modelling: a case study of the Barts and the London hospitals.
In: Computing in Civil and Building Engineering, Proceedings of the International Conference, 30th June - 2nd July 2010, Nottingham, UK.
(Paper 93)
Harty, C.
(2010)
Implementing innovation: designers, users and actor-networks.
Technology Analysis & Strategic Management, 22 (3).
pp. 297-315.
ISSN 1465-3990
doi: https://doi.org/10.1080/09537321003647339
Liu, K., Nakata, K. ORCID: https://orcid.org/0000-0002-7986-6012 and Harty, C. F.
(2010)
Pervasive informatics: theory practice and future directions.
Intelligent Buildings International, 2 (1).
pp. 5-19.
ISSN 1750-8975
doi: https://doi.org/10.3763/inbi.2009.0041
Harty, C. and Koch, C.
(2010)
The surprisingly orderly world of multi-community artefacts.
In: EASST, 25th - 29th August 2010, Tokyo, Japan.
Harty, C. and Araujo, L.
(2009)
Aligning user practices in innovation: The case of Heathrow's Terminal 5 project.
In: Hakansson, H., Waluszewski, A., Prenkert, F. and Baraldi, E. (eds.)
Use of science and technology in business: Exploring the impact of using activity for systems, organizations and people.
Emerald, Bingley UK, pp. 271-290.
ISBN 9781848554740
Harty, C.
(2009)
Foucault, surveillance and the ‘dark side’ of BIM.
In: 25th Annual ARCOM Conference, Nottingham, UK.
Harty, C. and Collinge, W.
(2009)
Improving information sharing across construction stakeholders: an organizational semiotics approach.
In: Joint International Symposium of CIB Working Commissions: W65 and W55, 27 Sep - 01 Oct 2009, Dubrovnik, Croatia, pp. 348-357.
Larsen, G.D. and Harty, C.
(2009)
Regulations and innovations across the UK construction sector: Social shaping in action.
In: 5th Nordic Conference on Construction Economics and Organisation, Reykjavik, Iceland, pp. 3-12.
Harty, C. and Collinge, W.
(2009)
Using organizational semiotics theory and analysis for IT systems design: improving information exchange processes amongst construction project stakeholders.
In: CIB W78, Istanbul, Turkey.
Harty, C.F. and Leiringer, R.
(2008)
Construction management researchers as agents of change: balancing academic priorities and industry impact.
In: Proc CIB W55/65 Joint International Symposium, Dubai.
Harty, C. F.
(2008)
Enacting digital coordination: Developing and implementing data management practices in construction work.
In: Proc. CIB Joint International Symposium, Dubai.
Harty, C. F.
(2008)
Implementing innovation in construction: Contexts, relative boundedness and actor-network theory.
Construction Management and Economics, 26 (10).
pp. 1029-1041.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446190802298413
Green, S. D. ORCID: https://orcid.org/0000-0003-1660-5592, Harty, C., Elmualim, A. A., Larsen, G. D. and Kao, C. C.
(2008)
On the discourse of construction competitiveness.
Building Research and Information, 36 (5).
pp. 426-435.
ISSN 0961-3218
doi: https://doi.org/10.1080/09613210802076666
Harty, C.
(2008)
Sociology and construction management research: Issues, approaches and implication.
In: Proc. 24th Annual ARCOM Conference, Cardiff, UK.
Green, S. D. ORCID: https://orcid.org/0000-0003-1660-5592 and Harty, C. F.
(2008)
Towards a co-production research agenda for construction competitiveness.
In: Proc CIB Joint International Symposium, Dubai.
Whyte, J. and Harty, C.
(2008)
What is the object? Coordinating design work across a large construction project.
In: Academy of Management, Anaheim, CA.
Harty, C. and Whyte, J.
(2008)
The role of media in construction design work and ecologies of practice.
In: LEAD Leadership in Construction, Lake Tahoe, California, USA.
Harty, C.
(2007)
Implementing innovation: Transforming practices and technologies in construction work.
In: CIB World Congress, Cape Town, South Africa.
Harty, C.
(2007)
Objects and subjects: The role of technology in the production of construction practice.
In: Managing the construction of buildings, Copenhagen Business School.
Harty, C. and Leiringer, R.
(2007)
Social science research and construction: Balancing rigour and relevance.
In: Construction Management and Economics 25th Anniversary Conference, Reading.
Harty, C., Goodier, C., Soetanto, R., Austin, S., Dainty, A. and Price, A.D.F.
(2007)
The futures of construction: A critical review of construction future studies.
Construction Management and Economics, 25 (5).
pp. 477-493.
ISSN 0144-6193
doi: https://doi.org/10.1080/01446190600879117
Harty, C., Goodier, C., Soetanto, R., Austin, S., Dainty, A., Price, A. and Thorpe, T.
(2006)
Scenario development: a methodology for aligning contemporary practices with the potential futures of UK construction.
In: 22nd Annual ARCOM Conference, Birmingham, UK, pp. 601-610.
Harty, C.
(2006)
The role of users and contexts in innovation.
In: Construction in the XXI Century: Local and global challenges, Rome, Italy.
Harty, C.
(2005)
Innovation in construction: a sociology of technology approach.
Building Research and Information, 33 (6).
pp. 512-522.
ISSN 1466-4321
doi: https://doi.org/10.1080/09613210500288605
This list was generated on Thu Dec 26 15:57:04 2024 UTC.