Article
Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136, Hillebrandt, P. and Murdoch, J.
(2000)
The impact of contract duration on the cost of cash retention.
Construction Management and Economics, 18 (1).
pp. 11-14.
ISSN 0144-6193
doi: https://doi.org/10.1080/014461900370906
Kagioglou, M., Cooper, R., Aouad, G. and Sexton, M.
(2000)
Rethinking construction: the Generic Design and Construction Process Protocol.
Engineering Construction and Architectural Management, 7 (2).
pp. 141-153.
ISSN 1365-232x
doi: https://doi.org/10.1108/eb021139
Rowlinson, S., Matthews, J., Phua, F. ORCID: https://orcid.org/0000-0001-5736-5973, McDermott , P. and Chapman , T.
(2000)
Emerging issues in procurement systems.
Journal of Construction Procurement, 6.
pp. 90-103.
ISSN 1358-9180
Sarshar, M., Haigh, R., Finnemore, M., Aouad , G., Barrett, P.S., Baldry, D. and Sexton, M. G.
(2000)
SPICE: a business process diagnostic tool for construction projects.
Engineering, Construction and Architectural Management, 7 (3).
pp. 241-250.
ISSN 0969-9988
doi: https://doi.org/10.1108/eb021149
Yang, P. and Lu, S. ORCID: https://orcid.org/0000-0001-6773-5907
(2000)
Combining self-learning neural network and neighbor search algorithms to solve the TSP problems.
Transportation Planning Journal, 29 (2).
pp. 281-294.
Yang, P. and Lu, S. ORCID: https://orcid.org/0000-0001-6773-5907
(2000)
Study on the optimal model using self-learning neural network for the layout of construction engineering material.
Journal of Cheng Shiu Junior College of Technology & Commerce., 13.
pp. 61-67.
Yang, P. and Lu, S. ORCID: https://orcid.org/0000-0001-6773-5907
(2000)
An optimization for construction earthwork resource deployment by using artificial neural network.
Journal of Cheng Shiu Junior College of Technology & Commerce, 13.
pp. 69-77.
Conference or Workshop Item
Doyle, A. and Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136
(2000)
The influence of project complexity on estimating accuracy.
In: 16th Annual ARCOM Conference, 6-8 Sep 2000, Glasgow Caledonian University, pp. 623-634.
Green, S. D. ORCID: https://orcid.org/0000-0003-1660-5592
(2000)
A critical interpretation of the formulation of construction best practice.
In: CIB joint meeting W55 / W65 / TG23 / TG31 / TG35, 13-15 Sep 2000, University of Reading, UK.
Green, S. D. ORCID: https://orcid.org/0000-0003-1660-5592
(2000)
The future of lean construction: a brave new world.
In: 9th Conference of the International Group for Lean Construction (IGLC 9), 17-19 Jul 2000, University of Sussex, UK.
Hillebrandt, P. M. and Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136
(2000)
What are the costs of procurement and who bears them?
In: 2nd Int. Conf on Construction in Developing Countries, 15-17 November 2000, Gaborone, Botswana..
Yang, P. and Lu, S. ORCID: https://orcid.org/0000-0001-6773-5907
(2000)
The automatic layout model in the sequencing of construction activities of multi-objective diaphragm wall unit by using self-learning neural network.
In: 17th IAARC/CIB/IEEE/IFAC/IFR International Symposium on Automation and Robotics in Construction (IAARC 2000), 18-20 Sep 2000, Taipei, Taiwan, pp. 799-806.
Yang, P. and Lu, S. ORCID: https://orcid.org/0000-0001-6773-5907
(2000)
The study of using self-learning neural network in automatic construction-site layout.
In: 17th IAARC/CIB/IEEE/IFAC/IFR International Symposium on Automation and Robotics in Construction (IAARC 2000), 18-20 Sep 2000, Taipei, Taiwan, pp. 839-845.
Book
Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136
(2000)
ARCOM construction management abstracts : cumulative abstracts and indexes of journals in construction management, 1999 update.
Association of Researchers in Construction Management, Reading, pp97.
ISBN 9780953416134
Murdoch, J. R. and Hughes, W. ORCID: https://orcid.org/0000-0002-0304-8136
(2000)
Construction contracts: law and management (3rd edition).
E & F N Spon, London, pp381.
ISBN 9780419261704